PRE-CONSTRUCTION TREATMENT

During construction of a building is the best time to treat for subterranean termites due to the ability to place a chemical or even physical barrier between the soil and the building. Cost of a pre-construction termite treatments are much less than that of a post- construction treatment and will provide a much more thorough treatment. All pipe penetrations and other conducive areas of a foundation can easily and thoroughly be treated before the concrete is poured. So if you are in the process of building a home and have not yet poured the foundation, give us a call. We will be glad to schedule a free on site consultation and estimate to discuss all of you termite control needs. If you have already poured your slab and are about to start framing the walls it is still not too late for a preventative treatment. See our Borate Treatment page.